We’re finally – mostly – operable. We have water, including hot water – and we’re leak-free. There are floors, sort of. It’s still unfinished subfloor in the bathroom but no need to worry about falling through. (Spousal unit will lay the tile again. Eventually.) The only thing left to fix is the water main valve….